VDOT OKs Work To Begin On $3.8B Hampton Roads Bridge-Tunnel Expansion

The Virginia Department of Transportation has issued its approval for the Hampton Roads Bridge-Tunnel’s five-year, $3.8 billion expansion to proceed, VDOT announced Thursday.

Hampton Roads Connector Partners (HRCP) received a notice to proceed for the project, allowing the builder to start interstate and tunnel work in the 9.9-mile corridor. Some preparations have started for the largest roadways project in Virginia’s history and one of the biggest nationally, which will add twin two-lane tunnels next to two existing tunnels.

HRCP, a joint venture led by New York-based Dragados USA Inc. and including Vinci Construction, Flatiron Construction Corp., Vinci subsidiary Dodin Campenon Bernard and designers HDR and Mott MacDonald, won the contract for the project, expected to conclude in 2025. It will double the number of lanes in the bridge-tunnel and ease traffic, VDOT says. HRCP received state and federal permits last month to start work in the waterways and along Interstate 64 between Hampton and Norfolk. Geotechnical borings and staging work on the HRBT South Island for a tunnel boring machine (TBM) began this summer.

​READ FULL ARTICLE HERE